Purchase view access permits inspection. Changing an order requires Purchase edit access. Use search, filters, sorting, pagination and Column view independently in each table. Their column layouts are saved separately. Removing a filter does not remove a product from the order.

Read Original quantity and Free stock

Original quantity shows the supplied original advice in proposed and draft order tables. Missing advice and manual-order rows show –, not zero. A supplied zero remains zero. This column is read-only.

Original quantity is an optional column, not part of the default layout. Select it through Column view to compare advice with Quantity. It does not offer sorting or an active filter. Changing Quantity does not edit Original quantity.

In the advised-quantity side panel, Free stock can show fractional values. A missing value shows –, not zero. This display does not change the stored stock or advice.

Work with order lines

Adjust the products and editable line values in a proposed purchase order before saving or placing it.

Before you edit purchase order lines

  • Open the correct proposed order with Purchase edit access.
  • Review supplier and order information before changing lines.
  • Confirm whether a Product should be ordered, removed, or phased out.

Steps to edit purchase order lines

Use only the changes you need. You can add products without first editing or removing existing lines. Skip search when the intended product is visible.

  1. Review Products in order, ETA and Order value above the tables.
  2. Open Supplier and order info after supplier information loads.
  3. Check the supplier constraints, dates, notes and totals in the side panel.
  4. Review the existing lines under Current order.
  5. Edit quantities in Current order where needed.
  6. Remove lines you do not want. Use a row's Remove, or select current lines and choose Remove.
  7. Search Available products for an eligible supplier-linked product. Use that table's search or filters when needed.
  8. Add the intended product using its row action, or select products and choose Add.
  9. Check the resulting quantities in Current order and correct them where needed.
  10. Use Phase out only when you intend to phase out the product, then review its confirmation.
  11. Use Clear selection to cancel a row selection before applying an action.
  12. Review the changed line set, totals and warnings.
  13. To retain work, open Options and choose Save order... or Save order.
  14. If the save dialog appears, review it and select Proceed, or Cancel to return.
  15. Check the resulting draft and its saved lines before continuing.

You can also edit Price (base), Weight or Volume where enabled.

For a specific new-line quantity, enter it in Available products where shown and use that row's Add. Selected Add can use a different quantity. Always check the resulting Current order quantity. Editing an available quantity alone does not add the product.

When row Remove opens Remove product, choose Just this order and Confirm to exclude only this line. Do not choose Phase-out or Ignore for a temporary line removal. Clear selection cancels selection, not an applied Add or Remove. These line changes do not replace Save order or place the order.

To place a final proposal directly, use Place order... instead and review its separate confirmation. Opening that confirmation can save a draft first. Canceling placement does not undo that save.

Fields in the purchase order lines

  • Quantity is the ordered line quantity.
  • Price (base) provides editable price context where enabled.
  • Weight and Volume provide container or transport context where enabled.
  • Current order contains included lines. Available products contains supplier-linked products you can add.
  • Add includes a product. Remove excludes an order line. Phase out changes the product's purchasing lifecycle.
  • MOQ is the supplier minimum quantity. Lot size is the supplier ordering increment.
  • Product name, Product SKU, Product EAN code and Product article code identify your product.
  • Supplier-product identifiers identify the relationship for this particular supplier.
  • Total Price shows the resulting line total. Weight is shown in grams and Volume in cubic centimetres when enabled.
  • Quantity (lots) provides lot-based quantity context when the supplier uses it.
  • Optional stock, lead-time, forecast, demand, service-level and classification columns provide planning context, not additional order lines.

What you see when editing purchase order lines worked

The order contains the intended products and valid line values, ready to save as a draft or review for placement.

Limits of edit purchase order lines

  • Editable fields and actions depend on permissions, Product-supplier relationships, supplier settings, and order state.
  • Removing a line is not the same as phasing out the Product.
  • When quantities are exported as lots, the minimum quantity is one supplier lot, and quantities must follow the lot size.
  • Otherwise, the quantity input permits zero. Setting a Current order quantity to zero removes that line.
  • Review MOQ separately. It is not always the quantity input's minimum.
  • Only eligible supplier-linked products appear in Available products. A supplier relationship alone does not guarantee a listing.
  • Editing a proposal does not guarantee a particular future recommendation.

If you could not edit purchase order lines

  • If a product is missing, clear search and filters in Available products, then refresh that table.
  • If a product cannot be added, check its supplier relationship, Available setting and purchasing fields.
  • If you removed a line by mistake, find it in Available products and use Add if it remains eligible. Check its quantity.
  • If a value is rejected, correct the visible validation and review MOQ or lot-size information where shown.
  • If changes do not persist, reopen the saved draft and check its values before editing again. Wait for saving and both tables to finish loading when Options is disabled.

Skip purchase advice

Use Options → Skip purchase advice when you decide not to place the proposed order moment. Review the selected option carefully before confirming.

Before you skip purchase advice

  • Open the intended proposed order with Purchase edit access. View-only access does not show the action.
  • Wait for saving and both tables to finish loading before opening Options.
  • Skip requires an order moment and a supplier reorder period. Without an order moment, the menu offers Ignore supplier instead.
  • If Missing supplier's reorder period appears, check that supplier setting before continuing.

Steps to skip purchase advice

For a manually managed agenda, Custom date is disabled. If no next moment exists, Next order moment is also disabled. The dialog then defaults to Ignore supplier. Select Cancel if you only intended to skip one moment, rather than exclude the supplier indefinitely.

The dialog warns that skipping the order moment cannot be undone. Do not confirm as a temporary test.

  1. Check the supplier and proposed order you intend to skip.
  2. Open Options.
  3. Select Skip purchase advice.
  4. In Skip order?, check the selected option and its displayed consequence.
  5. Select Next order moment if the offered next moment matches your decision.
  6. Alternatively, select Custom date where enabled.
  7. If you select Custom date, choose the intended date.
  8. Review the selected option, displayed date and warning before confirming.
  9. Select Skip order only for the intended action, or Cancel to leave it unchanged.
  10. After a successful skip, review the updated Proposed orders list.
  11. Open the next proposal you want to review.

Fields in the Skip order dialog

Option or controlMeaning
Next order momentUses the offered next moment. Check its displayed date.
Custom dateLets you select a date where enabled. It is disabled for manually managed agendas.
Ignore supplierExcludes the supplier from purchasing indefinitely, rather than skipping just this order moment.
Skip orderConfirms the selected action, including Ignore supplier when selected.
CancelCloses the dialog without applying the selected action.

Wait for the dialog to load before confirming. Confirmation is disabled during saving or loading, and when Custom date has no selected date.

What you see when skipping purchase advice worked

A successful editor skip returns you to the updated proposed-order list. It does not open the next proposal automatically. Review the supplier's resulting state before continuing. New advice does not have a guaranteed appearance time.

For the planning decision behind this action, see Purchase agenda.

Limits of skipping purchase advice

Keep these actions separate:

  • Skip purchase advice with a next moment or custom date skips the current order moment rather than placing it.
  • Product pause or snooze is a product-level decision. The editor's Phase out action changes a product's purchasing lifecycle, not the supplier's whole order moment.
  • Ignore supplier excludes the supplier indefinitely, even when selected inside the skip dialog.
  • Deleting a saved order removes a draft. It is not a substitute for skipping proposed advice.

In the editable proposed-order list, row options can also offer Skip. Automatic purchasing disables those row actions. This alternative is not present in every layout. See the Purchase overview procedure, and check the same dialog warnings before confirming.

If skipping purchase advice did not work

  • If the action is missing, check Purchase edit access and whether this proposal has an order moment.
  • If Skip is disabled, check the supplier reorder period and wait for loading or saving to finish.
  • If the manual agenda has no next moment, cancel instead of confirming an unintended supplier exclusion. Review the supplier's Agenda separately.
  • Dialog closure alone does not confirm success. If an error appears or the result is unclear, refresh or reopen Purchase.
  • Inspect the original supplier's proposed-order state before retrying. If it remains unclear, Contact Support.

Connect product to supplier

To connect a missing product to this supplier, open Connect product to supplier, select the product and enter its supplier name, identifiers, Purchase Price, Min. Order Quantity and Lot Size. Select Save, then add the connected product to the order.

Before you connect a product to a supplier

  • Open a proposed purchase order with the correct supplier.
  • Have Purchase edit access and the supplier-related permission required for this action.
  • Know the supplier's product name, identifiers, purchase price, Min. Order Quantity, and Lot Size before entering them.
  • Confirm that the product should be marked Available or Preferred for this supplier.

Steps to connect a product to a supplier

  1. Open Available products.
  2. Select Connect product to supplier. In a proposed editor, the action can also be available in the editor's Options menu.
  3. In Product Information, open Select a product and search for the disconnected product.
  4. Select the product. The supplier-product fields become available after a product is selected.
  5. In Supplier Product Information, enter the supplier's Supplier Product Name, Supplier Product SKU, and Supplier Product EAN when applicable.
  6. In Purchase Information, enter Purchase Price, Min. Order Quantity, and Lot Size.
  7. In Options, choose whether to enable Available and Preferred. The descriptions are Mark as an available supplier and Mark as the preferred supplier.
  8. Select Add another before saving if you need another connection.
  9. Select Save, or Cancel to leave without saving.
  10. Check the supplier relationship and refresh Available products before adding the product.

Fields in the supplier-product connection form

  • Select a product — the disconnected product to connect. Search the list rather than creating a duplicate product.
  • Supplier Product Name — the product name used by this supplier. This field is required.
  • Supplier Product SKU — the supplier's stock-keeping identifier, when one exists.
  • Supplier Product EAN — the supplier's EAN, when one exists.
  • Purchase Price — the supplier purchase price in the displayed currency. Enter a positive value.
  • Min. Order Quantity — the supplier's minimum quantity for this product.
  • Lot Size — the supplier's ordering increment for this product.
  • Available — marks the relationship as an available supplier relationship.
  • Preferred — marks the relationship as the preferred supplier relationship.
  • Add another — keeps the dialog available for another connection after saving.
  • Save, Cancel — save the relationship or leave without saving.

No purchase-order table column is edited by this dialog. After saving, the relationship can be represented in Available products and in supplier-product columns such as Active, Preferred, Supplier product SKU, Supplier product EAN code, Lot size, and MOQ.

What you see when connecting a product to a supplier worked

The supplier-product relationship is saved when the dialog completes successfully. The product can then be available for the selected supplier and can be added to the order if the order and product meet the applicable constraints. Add another keeps the workflow ready for another connection.

Limits of connect a product to a supplier

  • The action is specific to the selected supplier; it does not change the product's purchasing values for every supplier.
  • Fields and actions can be hidden by permissions, edition, or account configuration.
  • A relationship does not by itself place an order or send information to the supplier.
  • Product availability, MOQ, Lot Size, and supplier identifiers must come from the supplier; do not estimate them.

If you could not connect a product to a supplier

  • If the supplier-product fields are disabled, select a product first.
  • If Save is disabled, check that a product is selected and that the required Supplier Product Name and Purchase Price values are valid.
  • If the product is not listed, search again, clear filters, or confirm that it is disconnected from this supplier.
  • If the action is missing, check Purchase edit access and the supplier-related permission. If it remains unavailable, ask an administrator to confirm that the workflow is enabled.
  • If saving fails, keep the entered supplier values, check for an existing relationship, and retry only after confirming that a duplicate was not created.

Optional purchase editor tools

Supplier and order info can show coverage time, Reorder period, Lead time, measured lead time, order type and date. It also shows Min. order value, last placed date, expected arrival, notes, totals and available container information.

Adjust order → Adjust order size recalculates proposed advice. Review the result because the adjustment can overwrite manual changes. Fill container appears only when the required container features are enabled. Review the preview before applying it.

Lite can lock forecast and safety-stock values in the advised-quantity side panel. Buffer stock, Unrealized sales and Covered by incoming child rows can be absent while Order up to remains. Product details is a separate display. Its parent Safety stock and Order up to rows can remain while their breakdown children are hidden. Hidden or locked values are not removed from planning calculations.

Questions customers ask about the purchase order editor

How do I remove a product from this order only?

Select the row's Remove, choose Just this order in Remove product and select Confirm. Do not choose Phase-out or Ignore for a temporary line removal.

What happens when I skip purchase advice?

Skip purchase advice under Options needs an order moment and a supplier reorder period, and Next order moment uses the offered next moment. Skipping cannot be undone, and new advice has no guaranteed appearance time.

Where do I see the notes of a proposed order?

The side panel of the editor shows the supplier constraints, dates, notes and totals. Check it before you edit the lines under Current order.