An advised order that is not placed can remain visible until it is placed or you take another order-moment action.

Before you follow the purchase agenda

  • Select the correct webshop and open Purchase.
  • Have Purchase access, with edit access for order actions.
  • Check supplier settings when the planned ordering rhythm looks wrong.
  • Confirm whether your webshop uses automatic purchasing before attempting manual placement.

Supplier settings inform planned advice. Review proposals on the advised day where possible, because delaying a decision can change the stock needed before delivery.

Steps to review and act on purchase advice

  1. Open Proposed orders in Purchase.
  2. Review the supplier, Planned date, Status and Type of each proposal.
  3. Check overdue advice and exceptional order types before postponing a decision.
  4. Open the proposal you want to review.
  5. Check the products, quantities, expected delivery information and order total.
  6. Review stock context and supplier ordering constraints for any line that needs attention.
  7. Adjust the proposal only if the changed quantities suit your purchasing decision.
  8. Select Place order... when you are ready to place the reviewed order.
  9. Confirm placement in the separate confirmation dialog.
  10. Check the resulting order state before starting another order for the same supplier.

If you need to retain work without placing it, use the offered Save order action. Continue from Draft orders later.

Review the supplier’s Agenda separately if future planning needs attention. A manual agenda controls regular planned dates, not every exceptional purchasing situation.

When to skip an order moment

If you decide not to place this order moment, use Skip purchase advice rather than leave the proposal without an intentional action. Review current stock needs and supplier constraints first, especially for overdue or exceptional advice.

Follow the editor's Skip purchase advice procedure. It covers Options → Skip purchase advice, the dialog choices, confirmation and recovery. Purchase edit access, an order moment and a supplier reorder period are required.

Check the selected dialog option before confirming. A manually managed agenda disables Custom date. Without a next moment, it also disables Next order moment and defaults to Ignore supplier. Cancel if you only intended to skip one moment. Ignoring excludes the supplier indefinitely. The dialog warns that skipping cannot be undone.

After a successful editor skip, you return to the updated proposed-order list. Check the supplier's resulting state, then open the next proposal you want to review. The next proposal does not open automatically. Dialog closure alone is not success confirmation. If the result is unclear, refresh or reopen Purchase and inspect the original supplier before retrying.

Keep the purchasing decisions separate:

  • Skip purchase advice with a next moment or custom date skips the current order moment, rather than placing it.
  • Product pause or snooze, including the editor's Phase out workflow, is a product-level purchasing decision.
  • Ignore supplier excludes a supplier indefinitely, rather than skipping only one moment.
  • Deleting a saved draft removes that draft. It does not replace the proposed-order Skip decision.

The editable list can also offer row options → Skip. Automatic purchasing disables those row actions, and the alternative is not present in every layout. See Purchase overview for the list route. Check the same dialog warnings there.

Fields in purchase-agenda review

Field or controlMeaning
SupplierThe supplier whose proposal you are reviewing.
Planned dateThe advised ordering date, not proof of placement or delivery.
StatusThe proposal’s timing state, such as overdue. It is separate from its order type.
TypeRegular or exceptional advice, including Backorder, Lost sales and Preponed.
Quantity / Order totalThe proposed amounts and value to review before proceeding.
Save orderSaves a draft through its own workflow. It does not place the order.
Place order...Opens a separate placement confirmation.
Skip purchase advice / Skip orderOpens the editor's skip dialog / confirms its selected action. Check for Ignore supplier before confirming.
Supplier AgendaThe supplier’s planning settings and dates.

Backorder and Lost sales have distinct icons and tooltips. Do not identify every exceptional type from one exclamation symbol. Preponed advice brings a regular order forward.

What you see when purchase-agenda review worked

Each reviewed proposal has an intentional next action. Placement has its own result and reference. A saved draft remains work to complete, not a placed order.

Limits of following the purchase agenda

  • A visible proposal or calendar date is not proof that an order exists or was placed.
  • Unhandled advice can remain visible. Skipping, saving and placing are distinct actions that change what you should review next.
  • Regular dates do not describe every exceptional advice path.
  • Automatic-purchasing configuration can prevent manual opening or ordering.
  • No agenda date guarantees stock availability, supplier acceptance or exact processing time.

If purchase-agenda review did not work

  • An expected proposal is missing: check webshop, tab, filters and supplier settings before creating another order.
  • Advice is overdue: review current stock needs before placing or skipping it.
  • A result is unclear: check Draft orders and Deliveries before retrying placement, to avoid duplicate orders.
  • Dates or access remain unclear: ask your administrator or Contact Support.