Purpose
Prerequisites
- You can review the Product's Suppliers table.
- You know the Product's supply risk, demand, commercial constraints, and operational requirements.
- You have the access needed to add or edit Supplier-product relationships or choose Preferred where that control is available.
- The account's single- or multiple-supplier configuration is known, because it controls whether another relationship can be added.
Steps
- Open the Product and review its linked Supplier products in Suppliers.
- Compare the available relationships using supplier identity, availability, purchasing constraints, lead time, price, and reliability information.
- Keep a single eligible relationship when the Product benefits from concentrated purchasing and the supply risk is acceptable.
- Maintain two or more eligible relationships when an alternative source is valuable and the team can keep the additional data accurate.
- Where the Active supplier panel is available, open it from the Product or Supplier-product context.
- Review Preferred, Active, Recommended, Available, and ignored indicators separately.
- Select an eligible Preferred option when you want to record that user-selected preference, then verify the state shown by the panel and table.
- If the account permits multiple suppliers, use Add new... to add another Supplier product and enter its relationship-specific fields.
- Revisit the choice when price, MOQ, Lot size, Product lead time (days), availability, reliability, or the cost of a stockout changes.
Fields and columns
Use the labels shown in the Product's Supplier-product table and active-supplier context:
- Preferred — a user-selected Supplier-product option where the control is available.
- Active — the operational Supplier-product selection shown by Optiply.
- Recommended — a system-derived recommendation.
- Available — whether the relationship can participate in the relevant workflow.
- Supplier name, Supplier product name, Supplier product SKU, and Supplier product stock — supplier-specific identity and stock context.
- Lot size, MOQ, Product lead time (days), Availability date, Price (base), Price (supplier), Cost price, and Discount price — relationship-specific comparison fields where available.
Do not call all four states “primary supplier.” Preferred, Active, Recommended, and Available can describe different values at the same time.
Expected result
The Product has the number of eligible Supplier-product relationships intended by the chosen strategy. If a preference is selected, the Supplier-product table or active-supplier panel shows the selected Preferred state where the control is available. The displayed Active and Recommended states remain separate system values.
Limitations
- A single-supplier configuration can block Add new... once a relationship exists; a multiple-supplier configuration can permit additional eligible links.
- A Preferred option can become unavailable, ignored, or otherwise ineligible. Do not assume that Preferred always remains Active.
- Optiply's recommendation is planning assistance. It is not a promise that one Supplier is always cheapest or best for every account.
- More relationships increase the data, integration, identifier, packaging, quality, and commercial information that must be maintained.
- The strategy does not by itself guarantee a purchase order, quantity, delivery, or stock outcome.
Errors and recovery
- If Add new... is disabled, check the account's single- or multiple-supplier configuration, pending edits, loading state, and Product permissions.
- If the Preferred control is unavailable, check whether the option is already Preferred, Available, ignored, or otherwise ineligible.
- If Supplier-product fields cannot be edited, unignore the Supplier and return to the Product's Suppliers table.
- If the displayed states do not match the intended strategy, review the relationship fields and the current Active/Recommended indicators rather than renaming one state as another.
- If a change is not visible, refresh or reopen the Product and verify the saved relationship values before making another change.