Purpose

Prerequisites

Steps

  1. Compare current and incoming stock shown for the product with the records you expect Optiply to use.
  2. Review the forecast and recent sales or stockouts, and note any upcoming promotion or campaign that could affect expected demand.
  3. Review the product and supplier lead-time and coverage, ordering-period, or next-order-moment information available to you.
  4. Review the desired or manually set service-level target, and check whether a phase-out or ignored status applies.
  5. Check applicable Maximum stock level and Stock availability.
  6. Confirm whether the purchase line was manually reduced.

Fields and meanings

  • Service-level target — the desired or manually set target being reviewed, not proof of actual service achieved.
  • Maximum stock level — a manual planning constraint where enabled, not a guaranteed physical ceiling.

Purchase advice is not simply demand for the reorder period. It can reflect demand and forecast context, stock position, lead time, service-level target, ordering cycle and supplier/product constraints. A stock value shown for planning should not automatically be treated as a physical-stock discrepancy.

Expected result

This review can identify values or constraints that deserve investigation. It cannot establish from a checklist alone which input caused the low advice, nor that changing one value will produce a particular quantity.

Limitations

Do not infer a universal ordering rule from a single item. There is no universal service-level or ABC percentage appropriate for every business. The review does not establish the cause or predict the effect of a settings change.

Errors and recovery

Contact Optiply support with the product SKU or code, supplier, advice and planning date, current and incoming-stock values shown, relevant forecast/promotion context, and the lead-time, ordering-cycle, target, constraint, or manual-line details you reviewed. See Promotions, Order up to, and Why a product is missing from purchase advice.