Purpose
Prerequisites
Steps
- Compare current and incoming stock shown for the product with the records you expect Optiply to use.
- Review the forecast and recent sales or stockouts, and note any upcoming promotion or campaign that could affect expected demand.
- Review the product and supplier lead-time and coverage, ordering-period, or next-order-moment information available to you.
- Review the desired or manually set service-level target, and check whether a phase-out or ignored status applies.
- Check applicable Maximum stock level and Stock availability.
- Confirm whether the purchase line was manually reduced.
Fields and meanings
- Service-level target — the desired or manually set target being reviewed, not proof of actual service achieved.
- Maximum stock level — a manual planning constraint where enabled, not a guaranteed physical ceiling.
Purchase advice is not simply demand for the reorder period. It can reflect demand and forecast context, stock position, lead time, service-level target, ordering cycle and supplier/product constraints. A stock value shown for planning should not automatically be treated as a physical-stock discrepancy.
Expected result
This review can identify values or constraints that deserve investigation. It cannot establish from a checklist alone which input caused the low advice, nor that changing one value will produce a particular quantity.
Limitations
Do not infer a universal ordering rule from a single item. There is no universal service-level or ABC percentage appropriate for every business. The review does not establish the cause or predict the effect of a settings change.
Errors and recovery
Contact Optiply support with the product SKU or code, supplier, advice and planning date, current and incoming-stock values shown, relevant forecast/promotion context, and the lead-time, ordering-cycle, target, constraint, or manual-line details you reviewed. See Promotions, Order up to, and Why a product is missing from purchase advice.